The table below shows common roof pitches and the equivalent grade degrees and radians for each.
1 4 roof slope.
The basic ranges of pitch are not uniformly defined but range from flat which are not perfectly flat but sloped to drain water up to 1 2 12 to 2 12 1 in 24 to 1 in 6.
This forms an angle of 18 5 between the horizontal section and the roof and creates a gentle incline that is seen as a midpoint between a low pitch and medium pitch roof.
An example for a steep sloped roof is 8 12.
A 3 in 12 roof rises 3 for every 12 of run.
The slope of a roof or pitch is determined by how many inches the roof rises over 1 foot or 12 inches.
To put it in perspective the angle of this slope would be around 30 degrees.
Conventional from 4 12 1 in 3 to 9 12 3 in 4.
Most roof s have a pitch in the 4 12 to 9 12 range.
A 4 12 is a roof slope that rises by 4 inches for every 12 inches across.
3 of rise per 12 of run is the same as 1 of rise per 4 of run or 1 4 25.
Slope ratio a roof that rises 4 inches for every 1 foot or 12 inches of run is said to have a 4 in 12 slope.
Liquid applied roofing must have a design roof slope of 1 4 12 or greater 2 slope.
This means that the rise of the slope goes up or down 8 inches for every 12 inches.
You can also calculate roof pitch even without using a roof slope calculator.
Why is the roof slope 25.
These roofs have a pitch less than 4 12.
If the rise is 6 inches for every 12 inches of run then the roof slope is 6 in 12 the slope can be expressed numerically as a ratio.
For most home styles roof pitches fall in a range 4 12 a moderate slope up to 8 12 fairly steep.
This measurement is best done on a bare roof because curled up roofing shingles will impair your measurement.
That s the same as a 14 degree slope or a 25 slope.
While roof slope is typically expressed in rise it can also be expressed in degrees or in percent of slope.
High pitched roofs often need extra fasteners and their pitch can be as high as 21 12.
The picture below shows the pitch of a 7 12 roof slope meaning that for 12 of horizontal measurement roof run the vertical measurement roof rise is 7.
They have a pitch ranging from 4 12 to 9 12.
This means for every 12 horizontal units the roof must rise a minimum of one fourth vertical unit.
Low slope roofing which requires special materials and techniques to avoid leaks and ranges from 1 12 2 12 to 4 12 1 in 3.